Addressing the challenges of offshore wind turbine installation and maintenance in high winds

Business case: Increasing maximum wind speeds for offshore wind installation

Business case: Increasing maximum wind speeds for offshore wind installation

Maximum wind speeds have a significant influence on costs and time required for offshore wind turbine installation projects. The maximum wind speed is the speed at which it is no longer possible to lift major turbine components (nacelle, tower and blades) by a jack-up vessel. The restricting factors are crew safety and equipment damage due to instability of the load during the hoist.

Kate Freeman and I recently performed an analysis of the main factors contributing to project delays and cost increases. Importantly, we have also analysed the impact of increasing the maximum wind speed – such that lifts can be performed at higher wind speeds. We looked at the potential savings by being able to complete offshore wind turbine installation projects in higher wind speeds. Continue reading

DEME CEO: Driving down offshore wind costs

Driving down offshore wind costs

In this second of two exclusive interviews with High Wind Challenge, DEME Group CEO Alain Bernard explains why the company invests in innovation and how it contributes to reducing offshore wind costs.

Can you explain the DEME Group’s basis for diversification, particularly into offshore renewables?

The essence is our speciality within certain niches and that we aim to be the best in those niches. Our dredging background has given us knowhow within different areas, such as the seabed, sea conditions and other marine environment factors as well as the associated technologies. We have specialised further in related niches, and without losing the focus of our core knowhow, we have expanded our activities. Continue reading

How to overcome technical constraints of the offshore wind lifting process

Technical constraints of lifting

The lifting process on jack-up vessels is a key process in any offshore wind turbine installation or maintenance project. Control systems such as tagline systems are a necessary part of the lifting setup. Their purpose is to help manoeuver loads – such as wind turbine components – to the desired point accurately and safely.

The most obvious source of movement of a hoisted load is due to inertia and wind. Yet the solutions for controlling these motions are subject to other practical constraints that often make it difficult to achieve sufficient control during the lifting process. Continue reading

Alain Bernard: Why offshore wind needs innovation

In an exclusive interview with High Wind Challenge, DEME Group CEO Alain Bernard, explains why innovation is needed for the offshore wind industry to advance and that true innovation will only happen with greater collaboration across the industry.

Belgian DEME Group is one of Europe’s largest marine engineering conglomerates. CEO Alain Bernard has seen it grow from a specialist dredging company into a highly diverse maritime business covering hydraulic projects, services to oil and gas companies, installation of offshore wind farms, environmental activities and more.

High Wind Challenge spoke to Alain Bernard about the main challenges and opportunities facing renewable energy. Continue reading